Yuhong Holding Group Co.,LTD
Place of Origin: | CHINA |
Brand Name: | YUHONG |
Certification: | ABS, GL, DNV, NK, PED, AD2000, GOST9941-81, CCS, ISO 9001-2008 |
Model Number: | HFW Finned Tube |
Minimum Order Quantity: | 1PCS |
---|---|
Price: | Negotiable |
Packaging Details: | Ply-wooden Case / Iron Case / Bundle With Plastic Cap |
Delivery Time: | 10 Days |
Payment Terms: | L/C,T/T |
Supply Ability: | 500 Tons Per Month |
Type: | Fined Tube | Name: | HFW Finned Tube |
---|---|---|---|
Standard: | ASTM A213 | FPI: | 3-25mm |
Fin Height: | 5-30mm | Application: | Power Plant |
Highlight: | Alloy Stainless Steel Tube TP304,Alloy Steel HFW Fin Tube,Power Plant HFW Finned Tube |
Manufacturing Process of HFW Fin Tubes
1. Raw Material Preparation
Choose base tubes of appropriate materials and specifications, according to application scenarios and performance requirements. Ensure they possess good mechanical properties and corrosion resistance.
Fin materials usually include alloy, carbon steel, stainless steel. Carbon steel fins have low cost and are suitable for general industrial occasions; stainless steel fins perform well in environments with high corrosion resistance requirements. The shape and size of fins also need to be determined according to design requirements.
2. Fin Forming
Blanking Method: Use a punch and die to blank the fin material into the required shape and size.
Rolling Method: Continuously roll metal strips into fin shapes through special rolling equipment.
3. High - Frequency Welding (HFW)
(1).Positioning of Base Tube and Fins
Convey the prepared base tube to the welding station through a feeding device, and at the same time, accurately sleeve the fins on the base tube at a certain spacing and angle.
(2).High - Frequency Induction Heating
Use a high - frequency induction coil to heat the contact part of the base tube and fins.
(3).Pressure Application for Welding
While heating, apply a certain pressure to the fins through a mechanical device to make the fins closely contact the base tube.
4. Cut - to - Length
According to actual usage requirements, cut the welded fin tubes into specified lengths using cutting equipment.
5. Surface Treatment (Optional)
6. Quality Inspection
Contact Person: Max Zhang
Tel: +8615381964640
Fax: 0086-574-88017980