Yuhong Holding Group Co.,LTD
Place of Origin: | CHINA, KOREA |
Brand Name: | YUHONG |
Certification: | ASME, ASTM, ASME U Stamp |
Model Number: | CARBON STEEL TUBE BUNDLE |
Minimum Order Quantity: | 1 SET |
---|---|
Price: | 0-1000000USD |
Packaging Details: | Wooden export crates |
Delivery Time: | 30-60DAYS |
Payment Terms: | T/T, L/C, D/A |
Supply Ability: | 15 SETS/MONTH |
Tube: | ASME SA213 TP316L | Tubesheet: | ASTM A350 GRADE LF2 CLASS 1 |
---|---|---|---|
Baffles: | A/SA 516 Gr.70+N | Rods: | ASTM A194 Grade 2H |
Spacers: | ASME SA213 TP316L | Support Plate: | SA516 GR.70N |
Highlight: | carbon steel heat exchanger tube bundle,ASME hydrotest heat exchanger tubes,seamless tubes heat exchanger bundle |
TEMA Class R Exchanger: Carbon Steel Seamless Tubes Bundle, 1.5×Hydrotest per ASME Sec VIII
TEMA Class R Carbon Steel Heat Exchanger meets stringent ASME Section VIII and TEMA standards which ensures safety, reliability, and long-term performance in demanding industrial environments.
1. Advantages of Carbon Steel Tube Bundles
Feature | Benefits |
---|---|
Cost-Effective | Reducing project costs. |
High Mechanical Strength | Suitable for high-pressure applications. |
Thermal Conductivity | Efficient heat transfer properties. |
Weldability | Easier to fabricate and repair. |
Corrosion Resistance (with HIC) | Resist degradation in wet H₂S environments. |
Versatility | In oil & gas, petrochemical, and power generation. |
2. ITP (Inspection and Test Plan) for Carbon Steel Tube Bundles
Step No. | Stage | Acceptance Criteria | Witness/Review |
---|---|---|---|
1 | Raw Material Inspection | ASTM or ASME standards | QC, Third-Party Inspector |
2 | Tube Dimensional Check | Per design drawings and tolerances | QC |
3 | Tube Sheet Inspection | As per ASME Sec VIII requirements | QC |
4 | Tube-to-Tube Sheet Welding | ASME Sec IX standards | Third-Party Inspector |
5 | Baffle and Support Assembly | TEMA Class R specifications | QC |
6 | Hydrostatic Testing | No leakage or pressure drop | Authorized Inspector, Client |
7 | Final Inspection | TEMA standards | Client, Third-Party Inspector |
8 | Documentation Approval | Complete and accurate documentation | Client, QC |
3. Hydrostatic Testing Requirements and Procedure
Key Requirements:
Testing Procedure:
Preparation:
Pressurization:
Hold Period:
De-pressurization:
Post-Test Inspection:
Contact Person: Max Zhang
Tel: +8615381964640
Fax: 0086-574-88017980